Question No : 1
Which is part of the Prepare phase of PPDIOO?

正解:
Explanation:



Prepare Phase The Prepare phase establishes organization and business requirements, develops a network strategy, and proposes a high-level conceptual architecture to support the strategy. Technologies that support the architecture are identified. This phase creates a business case to establish a financial justification for a network strategy

Question No : 2
Which two design criteria require VLANs in a proposed solution? (Choose two.)

正解:

Question No : 3
What are the three models that are required in the systematic approach of the top-down design methodology? (Choose three.)

正解:

Question No : 4
What design requirement is necessary for campus network access layer switching?

正解:

Question No : 5
Refer to the exhibit.



Where should routes in the routing table be aggregated or summarized?

正解:

Question No : 6
What two addresses are defined under RFC 1918? (Choose two.)

正解:

Question No : 7
In which two places is redundancy recommended in an enterprise campus network design? (Choose two.)

正解:

Question No : 8
Refer to the exhibit.



On which router should you configure redistribution?

正解:

Question No : 9
What type of topology supports WAN redundancy when a balance is required between cost, high availability, and performance?

正解:

Question No : 10
In which phase of PPDIOO are the network requirements identified?

正解:
Explanation:



Plan Phase The Plan phase identifies the network requirements based on goals, facilities, and user needs. This phase characterizes sites and assesses the network, performs a gap analysis against best-practice architectures, and looks at the operational environment. A project plan is developed to manage the tasks, responsible parties, milestones, and resources to do the design and implementation. The project plan aligns with the scope, cost, and resource parameters established with the original business requirements. This project plan is followed (and updated) during all phases of the cycle.

Question No : 11
Which Cisco security mechanism has the attributes listed below?
-it is a sensor appliance
- it searches for potential attacks by capturing and analyzing traffic
- it is a "purpose-built device"
- it is installed passively
- it introduces no delay or overhead

正解:

Question No : 12
A network design engineer is seeking a dynamic routing protocol that supports fast convergence in a Cisco environment. What protocol allows for this?

正解:

Question No : 13
Refer to the exhibit.



You are designing routing between building distribution switches and campus core switches. Assuming that all links have the same speed, which statement about these designs is true?
A. Option A has more fault tolerance and faster convergence than Option B.
B. Option B has more fault tolerance but slower convergence than Option A.
C. Option B has more fault tolerance and faster convergence than Option A.

正解: B

Question No : 14
Which HSRP parameters must match, to ensure proper functionality?

正解:

Question No : 15
Which two Cisco products can be used in a data center to support OTV technology? (Choose two.)

正解: