IT認証試験問題集
毎月、ITshikenは1500人以上の受験者が試験準備を助けて、試験に合格するために受験者にご協力します
 ホームページ / C9010-251 問題集  / C9010-251 問題練習

IBM C9010-251 問題練習

Power Systems with POWER8 Scale-out Technical Sales Skills V1 試験

最新更新時間: 2019/05/15,合計367問。

平成から令和へ:C9010-251 最新真題を買う時、日本語版と英語版両方を同時に獲得できます。

実際の問題集を練習し、試験のポイントを了解し、テストに申し込むするかどうかを決めることができます。

さらに試験準備時間の35%を節約するには、C9010-251 問題集を使用してください。

 / 25

Question No : 1
Which technology provides simple virtualization for Ethernet, with quality of service controls that specify minimum bandwidth per partition?

正解:

Question No : 2
A customer is willing to console severs servers running Oracle and DB2 databases from several departments on a single server, while keeping each department administratively separate, each within their own operating system.
They are concerned about licensing after consolidation, because they are not willing to pay for Oracle licenses for the cores running DB2 and pay for DB2 licenses on cores running Oracle.
What would be the best method to handle this situation, to make environment compliant and achieve the customer demands?

正解:

Question No : 3
A customer wants to deploy SAP HAHA on IBM Power Systems.
Which operating system is supported?

正解:

Question No : 4
Which of the following Power Scale-Out operating systems includes integrated database and middleware components?

正解:

Question No : 5
A customer base Power 750 with eight cores and 256GB of memory running Red Hat Linux. They want to move to POWER8 and use an existing EXP24S. The new workload requires sixteen cores and 1.5TB of memory.
Which server will satisfy the requirements?

正解:

Question No : 6
A client would like to use Power servers to reliably manage large volumes of structured and unstructured data using the Hadoop open source framework.
Which IBM offering will satisfy their requirement?

正解:

Question No : 7
A customer will be using an S822L and PowerKVM. They want to know how they will attach a console to their machine over the network during installation.
Which console solution should they use?

正解:

Question No : 8
A customer received a Total Cost of Ownership analysis report detailing the financial benefits of consolidating multiple systems onto virtual partitions on Power Scale-out servers.
Which of the following directly affects the power and cooling expense estimates based on the report?

正解:

Question No : 9
What is an advantage, for the Power System administrator, of using NPIV for using VPIV for storage virtualization?

正解:

Question No : 10
What would improve overall utilization of physical memory resources by allowing a group of partitions to share a pool of physics memory resources?

正解:

Question No : 11
A customer anticipates having very heavy network and storage I/O traffic across their virtualized environment. They are interested in segregating the I/O workloads. They also want to be able to perform maintenance on their VIO Servers without downtime.
Which option will satisfy their requirements?

正解:

Question No : 12
A customer needs a new server for their database currently running on a 16-corn POWER7 4.1GHz based server. Oracle has informed the customer that their SPARC T7 based servers are best suited for running databases, because the SPARC T7 has eight threads per core, while the current servers only allow for up to four threads per core.
Which of the following statements could be correctly used to reject the Oracle claim?

正解:

Question No : 13
A Power S822 is configured with the eight SFF disk storage backplane (EJ0U) with external SAS port.
Which expansion option is supported by the external SAS port connector of the EJ0U?

正解:

Question No : 14
Which of the following is Open source software that hosts the virtual machines on a KVM hypervisor?

正解:

Question No : 15
A customer wants to use Live Partition Mobility to migrate from ear POWERB machine to their POWER7+ machine.
What is an important consideration when attempting the migration?

正解:

 / 25