IT認証試験問題集
毎月、ITshikenは1500人以上の受験者が試験準備を助けて、試験に合格するために受験者にご協力します
 ホームページ / C_TSCM42_66 問題集  / C_TSCM42_66 問題練習

SAP C_TSCM42_66 問題練習

SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP6 試験

最新更新時間: 2021/01/13,合計32問。

2021新年のギフト:C_TSCM42_66 最新真題を買う時、日本語版と英語版両方を同時に獲得できます。

実際の問題集を練習し、試験のポイントを了解し、テストに申し込むするかどうかを決めることができます。

さらに試験準備時間の35%を節約するには、C_TSCM42_66 問題集を使用してください。

 / 3

Question No : 1
Which option for selecting a routing exists when you create a production order?

正解:

Question No : 2
Which of the following statements best defines SAP ERP?

正解:

Question No : 3
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)

正解:

Question No : 4
Which of the following properties applies to multi-site planning in SAP ECC?

正解:

Question No : 5
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?

正解:

Question No : 6
Where can you define the default storage location for the material component of a production order? (Choose three)

正解:

Question No : 7
Which of the following properties about the planning functions available in SAP ECC applies?

正解:

Question No : 8
You want to produce a finished product only when it is requested by a customer order in make-toorder production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)

正解:

Question No : 9
Which functions can be triggered before releasing a production order? (Choose three)

正解:

Question No : 10
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)

正解:

Question No : 11
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?

正解:

Question No : 12
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order. However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)

正解:

Question No : 13
For which of the following objects can you enter a confirmation? (Choose two)

正解:

Question No : 14
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)

正解:

Question No : 15
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).
Which of the following planning file entries for this material are set by the system?

正解:

 / 3