Question No : 1
A customer needs a solution to prevent their five HPE ProLiant DL380 Gen9 servers from powering off due to a 10-second utility power loss.
Which power support solution should the integrator recommend to the customer?

正解:

Question No : 2
An HPE ProLiant Gen9 server running Server 2012 located at a remote site is not functioning property and cannot be accessed by any Remote Desktop applications. An integrator at the data center needs to access this remote server and find out what is causing the issue.
Which tool on the remote server can the integrator use to accomplish this?

正解:

Question No : 3
An integrator with 25 HPE ProLiant servers that run MS Windows Server 2012 needs to ensure that the latest drives and firmware are installed.
Which tool should the integrator use to accomplish this?

正解:

Question No : 4
A customer’s data center has cool air distributed by means of the plenum under the raised floor.
What should the integrator recommend to the customer to enable more efficient cooling of the rack-mounted HPE ProLiant Gen9 servers?

正解:

Question No : 5
An integrator needs to ensure that an HPE ProLiant ML150 Gen9 Server consistently has the most current updates for firmware and drives.
Which tool’s current version should the integrator use to accomplish this?

正解:

Question No : 6
An integrator installs an HPE ProLiant BL 460c Gen9 server into an HPE c7000 BladeSystem Enclosure that has HPE Virtual Connect Flex-10 Ethernet modules in interconnect bays 1 and 2, and HPE Virtual Connect 8Gb 24-Port Fibre Channel modules in interconnect bays 3-6. The blade is configured with two HPE LPe1605 16Gb Fibre Channel HBAs in mezzanine slots 1 and 2, 32 Gb memory, and a single E-2600 v3 processor.
Next, the integrator installs ESXi 5.5 update 2 on the server. However, only one HBA is recognized in the operating system. As a troubleshooting step, the integrator replaces the HBAs in the problem server with known working HBAs from another server. However, ESXi still recognizes only one HBA.
Which step should the integrator take to allow the server to recognize both HBAs?
A. Enable the 2nd HBA in the Onboard Administrator.
B. Install an additional 32Gb memory to allow the blade to access the 2nd mezzanine slot.
C. Install a 2nd processor to allow the blade to access the 2nd mezzanine slot.
D. Create two additional SAN Fabrics in Virtual Connect Manager for the 2nd HBA to use.

正解: C

Question No : 7
Which technology provides monitoring of power consumption at the core, load segment, stick, and outlet level with precision and accuracy in a core-and-stick architecture?

正解:
Explanation:Using the popular core and stick architecture of HP’s Modular PDU line the HP Intelligent PDU provides monitoring of power consumption at the core, load segment, stick, and outlet level with unmatched precision and accuracy. Remote managementis built in and even provides power cycle ability of individual outlet on the Intelligent Extension Bars. HP is also the first to incorporate Intelligent Power Discovery, which when combined with HP’s line of Platinum level high efficiency power supplies the Intelligent PDU actually communicates with the attached servers to collect asset information for the automatic mapping of the power topology inside a rack, greatly reducing the risk of human errors that can cause power outages.

Question No : 8
A customer needs to monitor device health, obtain warranty status, and track support cases for its HPE ProLiant Gen8 and 9 servers as well as its HPE Smart Storage products.
Which tool meets the customer’s needs?

正解:

Question No : 9
How do FlexFabric adapters provide for efficient overlay networking to increase VM migration flexibility and network scale, with minimal effect on server performance?

正解:

Question No : 10
What should the integrator do to successfully install Windows Server 2008 R2 Enterprise SP1 on an HPE ProLiant Gen9 server in UEFI mode?

正解:

Question No : 11
What is the minimum and maximum number of Active Cool 200 fans that an HPE c7000 BladeSystem Enclosure can support?

正解:
Explanation:A minimum of four hot-plug HPE Active Cool 200 Fans. For additional capacity, redundancy, and improved power consumption and acoustics, Active Cool 200 Fan kits can beadded for a maximum of 10 fans.

Question No : 12
For which purpose are the read-intensive SSD drives designed?

正解:

Question No : 13
An integrator needs to install additional servers in a data center and needs to avoid duplication of IP address information using Intelligent Provisioning.
Which setting does HPE recommend for the active NIC IP settings?

正解:

Question No : 14
5 Gbps for VM live migration traffic
.5 Gbps for management traffic
Redundancy is required for all types of traffic and each type of traffic needs to be isolated from the others.
Which adapter solution should the integrator choose to efficiently meet the requirements?

正解:

Question No : 15
Which component of HPE iLO Management provides base hardware monitoring and alerting capability?

正解:
Explanation:HPE Agentless Management 2.0: The base hardware monitoring and alerting capability is built into the system (running on the HPE iLO chipset) and starts working the moment thata power cord and an
Ethernet cable is connected to the server.