IT認証試験問題集
毎月、ITshikenは1500人以上の受験者が試験準備を助けて、試験に合格するために受験者にご協力します
 ホームページ / HPE2-T33 問題集  / HPE2-T33 問題練習

HP HPE2-T33 問題練習

HPE Converged Solutions 試験

最新更新時間: 2021/01/14,合計20問。

2021新年のギフト:HPE2-T33 最新真題を買う時、日本語版と英語版両方を同時に獲得できます。

実際の問題集を練習し、試験のポイントを了解し、テストに申し込むするかどうかを決めることができます。

さらに試験準備時間の35%を節約するには、HPE2-T33 問題集を使用してください。

 / 2

Question No : 1
A customer built a new virtualization environment from a number of diverse third-party components to save costs and enable its IT staff to develop expertise in the system . The customer expected better performance, but users report that the system is not performing to expectations.
Why would the ConvergedSystem 700 have been a better solution for their virtualization system?

正解:

Question No : 2
An HPE customer has a virtualization environment that contains various third party computing, storage, and network products. The solution enables the customer to virtualize its file, email, and web servers with capacity to spare.
Which statement describes a challenge presented by the customer's virtualization environment?

正解:

Question No : 3
What is an appropriate use case for the HPE Hyper Converged 250 solution?

正解:

Question No : 4
While designing a SAP HANA solution for a customer, what must an architect determine about the existing SAP applications to be integrated into the solution?

正解:

Question No : 5
Which two design parameters are required by the HPE Sizer for Converged Systems Virtualization to determine the proper specifications for a general virtualization solution? (Select two.)

正解:

Question No : 6
For a Hyper-Converged VDI solution, a VLAN-based network design model will require separate VLANs for which two functions? (Select two.)

正解:

Question No : 7
Which design area presents a unique challenge to architects when planning and implementing a VDI solution?

正解:

Question No : 8
What is the primary difference that distinguishes OLAP from OLTP?

正解:

Question No : 9
DRAG DROP
An HPE customer with a traditional IT infrastructure plans to optimize operations by implementing an HPE Composable Infrastructure.
Use the arrows to move the description of the steps of the implementation process on the left into the proper implementation order on the right.



正解:

Question No : 10
An SMB customer plans to expand its business nationally.
Its requirements are:
- a web-based intranet for its mission-critical applications
- low maintenance
- fast deployment
How will an HPE HyperConverged solution meet this customer's needs?

正解:

Question No : 11
A customer built a new virtualization environment from a number of diverse third-party components to save costs and enable its IT staff to develop expertise in the system . The customer expected better performance, but users report that the system is not performing to expectations.
Why would the ConvergedSystem 700 have been a better solution for their virtualization system?

正解:

Question No : 12
An HPE customer has a virtualization environment that contains various third party computing, storage, and network products. The solution enables the customer to virtualize its file, email, and web servers with capacity to spare.
Which statement describes a challenge presented by the customer's virtualization environment?

正解:

Question No : 13
What is an appropriate use case for the HPE Hyper Converged 250 solution?

正解:

Question No : 14
While designing a SAP HANA solution for a customer, what must an architect determine about the existing SAP applications to be integrated into the solution?

正解:

Question No : 15
Which two design parameters are required by the HPE Sizer for Converged Systems Virtualization to determine the proper specifications for a general virtualization solution? (Select two.)

正解:

 / 2